{"id":4611,"date":"2025-05-07T12:54:21","date_gmt":"2025-05-07T10:54:21","guid":{"rendered":"https:\/\/controlprocess.pl\/?p=4611"},"modified":"2025-05-08T10:14:51","modified_gmt":"2025-05-08T08:14:51","slug":"signing-of-the-contract-for-the-construction-of-a-modern-cogeneration-system-in-bielsko-biala","status":"publish","type":"post","link":"https:\/\/controlprocess.pl\/en\/signing-of-the-contract-for-the-construction-of-a-modern-cogeneration-system-in-bielsko-biala\/","title":{"rendered":"Signing of the contract for the construction of a modern cogeneration system in Bielsko-Bia\u0142a"},"content":{"rendered":"<p style=\"text-align: justify;\"><strong>On May 6, 2025, CONTROL PROCESS S.A. signed a contract with TAURON Ciep\u0142o Sp. z o.o. for the implementation of a strategic investment project for the largest district heating provider in the Silesian-D\u0105browa conurbation. The contract concerns the construction of a modern cogeneration system at the Combined Heat and Power Plant in Czechowice-Dziedzice (Bielsko-P\u00f3\u0142noc EC2).<\/strong><\/p>\n<p class=\"\" style=\"text-align: justify;\" data-start=\"0\" data-end=\"469\">The scope of the contract includes the design and turnkey construction of a modern combined heat and power (CHP) plant. The facility will comprise three cogeneration units, a water treatment station, a heat accumulator, auxiliary infrastructure, and all necessary installations and construction works. The installation will be integrated with the existing CHP infrastructure and will enable the simultaneous generation of electricity and heat in a cogeneration process.<\/p>\n<p class=\"\" style=\"text-align: justify;\" data-start=\"471\" data-end=\"715\">CONTROL PROCESS S.A. is responsible for the comprehensive execution of the project \u2013 from developing the design documentation, through equipment delivery, installation, and commissioning, to the handover of the completed facility for operation.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-4599 aligncenter\" src=\"https:\/\/controlprocess.pl\/app\/uploads\/2025\/05\/06.05.2025_Podpisanie-umowy-Control-Process-Tauron-Cieplo-1.png\" alt=\"\" width=\"575\" height=\"458\" srcset=\"https:\/\/controlprocess.pl\/app\/uploads\/2025\/05\/06.05.2025_Podpisanie-umowy-Control-Process-Tauron-Cieplo-1.png 1541w, https:\/\/controlprocess.pl\/app\/uploads\/2025\/05\/06.05.2025_Podpisanie-umowy-Control-Process-Tauron-Cieplo-1-300x239.png 300w, https:\/\/controlprocess.pl\/app\/uploads\/2025\/05\/06.05.2025_Podpisanie-umowy-Control-Process-Tauron-Cieplo-1-1024x815.png 1024w, https:\/\/controlprocess.pl\/app\/uploads\/2025\/05\/06.05.2025_Podpisanie-umowy-Control-Process-Tauron-Cieplo-1-768x612.png 768w, https:\/\/controlprocess.pl\/app\/uploads\/2025\/05\/06.05.2025_Podpisanie-umowy-Control-Process-Tauron-Cieplo-1-1536x1223.png 1536w, https:\/\/controlprocess.pl\/app\/uploads\/2025\/05\/06.05.2025_Podpisanie-umowy-Control-Process-Tauron-Cieplo-1-379x302.png 379w\" sizes=\"(max-width: 575px) 100vw, 575px\" \/><\/p>\n<p>&nbsp;<\/p>\n<p>The value of the investment will exceed PLN 350 million gross (PLN 287 million net), with completion scheduled for the fourth quarter of 2027.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>On May 6, 2025, CONTROL PROCESS S.A. signed a contract with TAURON Ciep\u0142o Sp. z o.o. for the implementation of a strategic investment project for the largest district heating provider in the Silesian-D\u0105browa conurbation. The contract concerns the construction of a modern cogeneration system at the Combined Heat and Power Plant in Czechowice-Dziedzice (Bielsko-P\u00f3\u0142noc EC2).<\/p>\n","protected":false},"author":1,"featured_media":4609,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"inline_featured_image":false,"footnotes":""},"categories":[1],"tags":[],"class_list":["post-4611","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-bez-kategorii"],"acf":[],"_links":{"self":[{"href":"https:\/\/controlprocess.pl\/en\/wp-json\/wp\/v2\/posts\/4611"}],"collection":[{"href":"https:\/\/controlprocess.pl\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/controlprocess.pl\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/controlprocess.pl\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/controlprocess.pl\/en\/wp-json\/wp\/v2\/comments?post=4611"}],"version-history":[{"count":3,"href":"https:\/\/controlprocess.pl\/en\/wp-json\/wp\/v2\/posts\/4611\/revisions"}],"predecessor-version":[{"id":4617,"href":"https:\/\/controlprocess.pl\/en\/wp-json\/wp\/v2\/posts\/4611\/revisions\/4617"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/controlprocess.pl\/en\/wp-json\/wp\/v2\/media\/4609"}],"wp:attachment":[{"href":"https:\/\/controlprocess.pl\/en\/wp-json\/wp\/v2\/media?parent=4611"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/controlprocess.pl\/en\/wp-json\/wp\/v2\/categories?post=4611"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/controlprocess.pl\/en\/wp-json\/wp\/v2\/tags?post=4611"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}