{"id":4266,"date":"2023-11-21T14:52:38","date_gmt":"2023-11-21T13:52:38","guid":{"rendered":"https:\/\/controlprocess.pl\/?post_type=oferty&#038;p=4266"},"modified":"2025-01-13T09:50:40","modified_gmt":"2025-01-13T08:50:40","slug":"construction-of-a-50-mw-extraction-condensing-turbine-set-at-tauron-cieplo-s-a","status":"publish","type":"oferty","link":"https:\/\/controlprocess.pl\/en\/oferty\/construction-of-a-50-mw-extraction-condensing-turbine-set-at-tauron-cieplo-s-a\/","title":{"rendered":"Construction of a 50 MW extraction-condensing turbine set at Tauron Ciep\u0142o S.A."},"content":{"rendered":"<p>The condensing-extraction turbine set construction project was carried out at the Nowa Generating Plant in D\u0105browa G\u00f3rnicza. The task involved the construction a complete condensing-extraction turbine set together with auxiliary devices and a power output system, on a general contracting basis (design, delivery, assembly, start-up, commissioning).<\/p>\n<p>The turbine set delivered by CONTROL PROCESS replaced two 25 MW units.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The task consisted of the installation of a complete bleeder-condensing turbine-generator together with equipment and auxiliary installations. <\/p>\n","protected":false},"featured_media":2602,"template":"","meta":{"inline_featured_image":false},"class_list":["post-4266","oferty","type-oferty","status-publish","has-post-thumbnail","hentry","kat_oferty-energetyka-en"],"acf":[],"_links":{"self":[{"href":"https:\/\/controlprocess.pl\/en\/wp-json\/wp\/v2\/oferty\/4266"}],"collection":[{"href":"https:\/\/controlprocess.pl\/en\/wp-json\/wp\/v2\/oferty"}],"about":[{"href":"https:\/\/controlprocess.pl\/en\/wp-json\/wp\/v2\/types\/oferty"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/controlprocess.pl\/en\/wp-json\/wp\/v2\/media\/2602"}],"wp:attachment":[{"href":"https:\/\/controlprocess.pl\/en\/wp-json\/wp\/v2\/media?parent=4266"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}