{"id":4263,"date":"2023-11-20T13:27:56","date_gmt":"2023-11-20T12:27:56","guid":{"rendered":"https:\/\/controlprocess.pl\/?post_type=oferty&#038;p=4263"},"modified":"2025-01-13T09:50:29","modified_gmt":"2025-01-13T08:50:29","slug":"modernizacja-gpz-wygoda","status":"publish","type":"oferty","link":"https:\/\/controlprocess.pl\/en\/oferty\/modernizacja-gpz-wygoda\/","title":{"rendered":"Modernisation of the Wygoda power substation"},"content":{"rendered":"<p>The subject of the contract was the \u201cModernisation of the Wygoda power substation\u201d, which included:<\/p>\n<p>Task No. 1: Development of design documentation and performance of works related to the modernization of the Wygoda power substation, and Task No. 2: Development of design documentation and performance of works related to the connection of the Bochnia Traction Substation to the grid, involving:<\/p>\n<ol>\n<li>a) development of detailed and as-built designs for each task separately,<\/li>\n<li>b) development of a construction design together with obtaining building permits for each task separately,<\/li>\n<li>c) performance of construction and assembly works according to the developed design documentation in respect of task no. 1,<\/li>\n<li>d) performance of construction and assembly works according to the developed design documentation in respect of task no. 2,<\/li>\n<li>e) dismantling, liquidation of existing Wygoda power substation equipment, management of all waste generated during the implementation of the project,<\/li>\n<li>f) performance of tests and measurements necessary for the commissioning of the modernized power infrastructure in accordance with regulations.<\/li>\n<\/ol>\n","protected":false},"excerpt":{"rendered":"<p>Construction of the new Wygoda substation based on high-voltage switchgear using GIS technology. <\/p>\n","protected":false},"featured_media":2095,"template":"","meta":{"inline_featured_image":false},"class_list":["post-4263","oferty","type-oferty","status-publish","has-post-thumbnail","hentry","kat_oferty-energetyka-en"],"acf":[],"_links":{"self":[{"href":"https:\/\/controlprocess.pl\/en\/wp-json\/wp\/v2\/oferty\/4263"}],"collection":[{"href":"https:\/\/controlprocess.pl\/en\/wp-json\/wp\/v2\/oferty"}],"about":[{"href":"https:\/\/controlprocess.pl\/en\/wp-json\/wp\/v2\/types\/oferty"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/controlprocess.pl\/en\/wp-json\/wp\/v2\/media\/2095"}],"wp:attachment":[{"href":"https:\/\/controlprocess.pl\/en\/wp-json\/wp\/v2\/media?parent=4263"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}