The node and gas pipeline system under construction were adapted for bidirectional (reverse) gas transmission, which improved the security of supplies.
The task included the design and construction of the Paldiski gas compressor station as part of the Balticconnector pipeline
Natural gas compressor station project in Estonia’s Puiatu as part of Estonian gas transmission system development plan
The construction of the gas compressor station consisted of three compressor sets and the necessary technical infrastructure required to operate them.
Implementation of construction and installation works involving the reconstruction of the Gustorzyn Distribution and Metering Junction, providing increased capacity, through the introduction of new DN 700 gas pipelines.
The subject of the project was the general contracting of the surface part of the ‘Kosakowo’ Underground Gas Storage Facility.
The assignment comprised an EPC contract for the comprehensive development of all oil and gas mine drilling zones.
The EPC project involved the construction of a new gas compressor station as part of the ‘Modernisation of the Jaroslav II gas compressor station’ project, as well as the demolition of the old plant.
The scope of the project included the construction and commissioning of a natural gas mine at the Jasionka II field. Process facilities included three-phase separation and gas drying facilities.
The scope of the project included the construction and commissioning of a new natural gas mine located in the Kupno field.