Design, delivery, assembly, start-up and commissioning of an ash removal system at the 910 MWe power unit at the Jaworzno power plant
Industrial Installations
TAURON Wytwarzanie S.A.
2016-2020
Design, delivery, assembly, start-up and commissioning of an ash removal system at the 910 MWe power unit at the Jaworzno power plant
Industrial Installations
TAURON Wytwarzanie S.A.
2016-2020
The scope of the project included the design and construction of a complete ash removal system on a turnkey basis, including, among others: sets of pneumatic pumps collecting ash from ESP (electrostatic precipitators) and an air heater, a pneumatic transport system, three ash storage silos (capacity 3,450 m3 each) and auxiliary systems.