Energetyka

Construction of a gas-fired power unit with a total electrical capacity of 55 MW

The first stage of the project involved the construction of two gas-fired boilers with a capacity of 150 Mg/h of heated steam each, with a pressure of 9 MPa and a temperature of 540 degrees C. The boilers were fired with gas: blast furnace gas, coke oven gas, natural gas. The installed boilers achieve nominal efficiency with simultaneous combustion of blast furnace gas and natural gas. As part of the works, an installation supplying natural gas from the high-pressure network and reduction and measurement stations were also built during the first stage of the project.