The node and gas pipeline system under construction were adapted for bidirectional (reverse) gas transmission, which improved the security of supplies.
The task included the design and construction of the Paldiski gas compressor station as part of the Balticconnector pipeline
As part of the task ‘Construction of a 2 x 125,000 Mg clinker silo’, CONTROL PROCESS carried out comprehensive work on the electrical installations.
Natural gas compressor station project in Estonia’s Puiatu as part of Estonian gas transmission system development plan
The construction of the gas compressor station consisted of three compressor sets and the necessary technical infrastructure required to operate them.
Implementation of construction and installation works involving the reconstruction of the Gustorzyn Distribution and Metering Junction, providing increased capacity, through the introduction of new DN 700 gas pipelines.
The subject of the project was the general contracting of the surface part of the ‘Kosakowo’ Underground Gas Storage Facility.
The assignment comprised an EPC contract for the comprehensive development of all oil and gas mine drilling zones.
As part of the contract, the sludge and biogas section of the Starachowice wastewater treatment plant was modernised.
The first phase of the task included the construction of two gas-fired boilers with a capacity of 150 Mg/h of heated steam each
Construction of an ash removal system for a 910 MWe power unit at Tauron Wytwarzanie S.A – Jaworzno III Power Plant Branch
Five-stage extension of the 400 kV switchgear at SE 220/110 kV Piła Krzewina.
The task included the construction of a new district heating plant for the city of Katowice
Construction of the new Wygoda substation based on high-voltage switchgear using GIS technology.
Realisation of cogeneration installations in gas-fired combined heat and power plants fuelled by de-methanisation gas at the Katowice District Heating Company.
The task consisted of the installation of a complete bleeder-condensing turbine-generator together with equipment and auxiliary installations.
Extension of the ‘Zabrze’ GPZ in the scope of the transformer station
Within the scope of the contract implementation, two investments were included: ‘Design and construction of the Municipal Waste Neutralisation Plant in Olsztyn’ and “Design and construction of an access road to the ZUOK”.
Construction of a waste management facility in Lulkowo.
Turnkey construction of a Mechanical-Biological Waste Treatment Facility
The task consisted in the construction of a mechanical-biological Waste Management Plant New Toniszewo Kopaszyn
The EPC project involved the construction of a new gas compressor station as part of the ‘Modernisation of the Jaroslav II gas compressor station’ project, as well as the demolition of the old plant.
Construction of a combined heat and power plant, fuelled by natural gas extracted from the Lubiatów crude oil and natural gas mine (‘LMG Project’)
The task included: the design, construction and commissioning of a combined heat and power plant based on gas-fired cogeneration engines.
The subject of the contract was the comprehensive realisation of the task of modernising the control and power supply installation for the rotary kiln at the Rudniki Cement Works.
Construction of a cogeneration system with a 4.0 MWe generator powered by gas from mine de-methanation and construction of a 110 kV substation.
The scope of the project included the construction and commissioning of a natural gas mine at the Jasionka II field. Process facilities included three-phase separation and gas drying facilities.
The scope of the project included the construction and commissioning of a new natural gas mine located in the Kupno field.
The order covered assembly and commissioning work for the investment task ‘Construction of the Radiotherapy Department at the St. Luke’s Regional Hospital in Tarnów’.
Supply and installation of an instrumentation and control installation and an electrical installation at the Jedlicze refinery.
As part of the general contracting, comprehensive design and construction work was carried out.
Expansion of the existing wastewater treatment plant in the town of Jaroslav in order to increase capacity, reduce nutrients and implement sludge management.